Sponsored Links
Pay Per Click Marketing
Analyze and Optimize Your PPC Bids Reduce Cost, Rank Higher, Boost ROI
lyris.com
Renewable Energy Storage
3 Ways To Profit from the Emerging Energy Storage Industry. New Report
www.greenchipstocks.com
Phase Change Materials
R & D and Manufacturing of Phase Change Materials (PCMs)
www.microteklabs.com
Directory Sites
Description of the Tennessee Valley Authority facility, with pictures and diagram. Cost $300 million in 1979, and generates 1.6 million kilowatts for 20 hours.
www.tva.gov
Diagram, several pictures, and text describing Raccoon Mountain as one of the engineering marvels of the '70's.
www.tva.com
TVA: Raccoon Mountain Pumped-Storage Plant
Picture of lake, with facts and figures. Includes visitor center hours, and link to downloadable (pdf) brochure.
www.tva.gov