Central Arizona Project Aqueduct

From Wikipedia, the free encyclopedia

(Redirected from Central Arizona Project)
Jump to: navigation, search

The Central Arizona Project Aqueduct (CAP) is a 336 mi (541 km) diversion canal in Arizona in the United States. The aqueduct diverts water from the Colorado River from Lake Havasu City near Parker into central and southern Arizona. The CAP is the largest and most expensive aqueduct system ever constructed in the United States. CAP is managed and operated by the Central Arizona Water Conservation District (CAWCD).

Contents

Mark Wilmer Pumping Plant
Mark Wilmer Pumping Plant

The CAP is a multipurpose water resource development and management project that delivers Colorado River water, either directly or by exchange, into central and southern Arizona. The project was designed to provide water to nearly one million acres (4,000 km²) of Indian and non-Indian irrigated agricultural land areas in Maricopa, Pinal and Pima Counties, as well as municipal water for several Arizona communities, including the metropolitan areas of Phoenix and Tucson. Authorization also was included for development of facilities to deliver water to Catron, Hidalgo, and Grant Counties in New Mexico, but these facilities have not been constructed because of cost considerations, a lack of demand for the water, lack of repayment capability by the users, and environmental constraints. In addition to its water supply benefits, the project also provides substantial benefits from power generation, flood control, outdoor recreation, fish and wildlife conservation, and sediment control. The project was subdivided, for administration and construction purposes, into the Granite Reef, Orme, Salt-Gila, Gila River, Tucson, Indian Distribution, and Colorado River divisions. During project construction, the Orme Division was re-formulated and renamed the Regulatory Storage Division. Upon completion, the Granite Reef Division was re-named the Hayden-Rhodes Aqueduct, and the Salt-Gila Division was renamed the Fannin-McFarland Aqueduct.

Aerial photo - Central Arizona Project
Aerial photo - Central Arizona Project

The CAP was created by the Colorado River Basin Project Act of 1968. This Act provided for the Secretary of the Interior to enter into an agreement with non-Federal interests, whereby the Federal Government acquired the right to 24.3 percent of the power produced at the non-Federal Navajo Generating Station, Navajo Project. The agreement also includes the delivery of power and energy over the transmission facilities to delivery points within the Central Arizona Project service area.

Construction of the project began in 1973 with the award of a contract for the Havasu Intake Channel Dike and excavation for the Havasu Pumping Plant (now Mark Wilmer Pumping Plant) on the shores of Lake Havasu. Construction of the other project features followed. The backbone aqueduct system, which runs about 336 miles (541 km) from Lake Havasu to a terminus 14 mi (22.5 km) southwest of Tucson, was declared substantially complete in 1993. The new and modified dams constructed as part of the project were declared substantially complete in 1994. All of the non-Indian agricultural water distribution systems were completed in the late 1980s, as were most of the municipal water delivery systems. Several Indian distribution systems remain to be built; it is estimated that full development of these systems could require another 10 to 20 years.

The final extension to Tucson required a borehole through the mountains.


Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.