Faslane Branch

From Wikipedia, the free encyclopedia

Faslane Branch
Locale Scotland
Dates of operation 1941 – 1983
Track gauge ft 8½ in (1435 mm)
Length 2½ miles
Headquarters Faslane


Faslane Branch
Faslane Bay
Belmore Crossing
Quarry siding
Shandon Crossing
Exchange sidings
Faslane Junction - junction with
West Highland Railway

The Faslane Branch was a standard gauge military railway built during World War II to serve "Military Port No.1" at Faslane.

Latterly, the branch was used to serve the ship breaking activities at Faslane.

Contents

The Faslane Branch diverged west from the LNER's West Highland Railway at "Faslane Junction", beyond which was a group of exchange sidings and a locomotive shed. Northwards from here, the single line crossed a bridge, then was double track all the way to Faslane Bay.

Near the 1 milepost was the level crossing at Shandon, where the railway crossed the road leading to Shandon station on the West Highland Railway. Sprung catch points were installed in the Up (southbound) line just south of the crossing on account of the gradient which fell steeply towards Faslane.

Near the 2 milepost, there was a quarry siding on the east side of the line, and a further set of catch points in both running lines.

A little further north was Belmore Crossing, where the railway crossed the A814 road. A signal box stood just north of the crossing, on the east side of the line.

The branch line ended at Faslane Bay, where an extensive layout of sidings was provided. The furthest extremity of the branch terminated alongside a platform.

Unusually for a British railway, right-hand running was in force over the double track, to familiarise the War Department personnel with the conditions that they would be likely to encounter while serving in Continental Europe.

In April 1946, when Faslane ceased to be military port, the running and maintenance of the branch line was taken over by the LNER, although it continued to be owned by the War Department, and subsequently the Ministry of Defence. The branch was reduced to single track on 30 May 1946, after which all trains would use the former Down (northbound) line. Catch points were installed in the single line just south of Shandon crossing.

Originally, the railway had block posts at Faslane Yard, Shandon L.C., Belmore L.C. and Faslane Bay. The points and semaphore signals at each location were worked from ground frames, with the exception of Belmore, where a signal box was built to house the lever frame (comprising 7 levers) and gate wheel. The three block sections were worked by the absolute block system.

From 1946, the single line was worked on the 'One Train Working' principle, with a train staff.

  • Article in "British Railway Journal" No.43 (Autumn 1992).


Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.