Golden Ears Bridge

From Wikipedia, the free encyclopedia

Current event marker
This article or section contains information about a bridge currently under construction.
It may contain information of a speculative nature, and the content may change dramatically as construction progresses and new information becomes available.
Concept rendering of the Golden Ears Bridge.
Concept rendering of the Golden Ears Bridge.

The Golden Ears Bridge is a new six-lane cable-stayed bridge to be built in Langley and Maple Ridge, British Columbia, crossing the Fraser River. The new bridge, owned by TransLink, will span one kilometre, have a clearance of 40 metres and create 13 kilometres of new road. It will have direct connections to Lougheed Highway, Maple Meadows Way, 113B Avenue, 200th Street, 176th Street (Highway 15) and the Trans-Canada Highway. The Golden Ears Bridge is slated to open in late June of 2009 and has a fixed total construction cost of $808 million (CAD).

The project was named through a community process and reflects the well-known lower Fraser Valley landmark, the Golden Ears peaks, which crown Mount Blanshard in Golden Ears Provincial Park. The successful submission to name the bridge was that of George Tabert, a local pastor.

The opening of the bridge will be followed by the cessation of the Albion Ferry, a passenger/vehicle ferry that has been operational since 7 June 1957 and employs 59 full-time and 18 auxiliary employees. In 2003, annual traffic amounted to 1.5 million vehicles and 4.0 million passengers.

Contents

  • August 6 - Environmental certification was received[1]
  • September 15 - TransLink and the Katzie First Nation signed a Benefit Agreement
  • November - The Greater Vancouver Transportation Authority Act was amended to allow for tolling

  • January - A Request for Proposals was issued for the design, construction, operation, maintenance and rehabilitation
  • February 16 - A bylaw governing tolling was passed by TransLink[2]
  • June 22 - TransLink and the four municipalities (Langley, Maple Ridge, Pitt Meadows and Surrey) finalized the Golden Ears Bridge Master Municipal Agreement[3]
  • December 7 - TransLink selected Golden Crossing Group as the proponent to design, build, finance, operate, and maintain the bridge.[4]

  • March 28 - Construction is halted as a fire destroys $205,000 worth of material on the bridge in the early morning.

  • June 05 - Bridge is expected to be open to traffic.[5]

The new bridge will use an electronic tolling system to track vehicles that cross to recover construction costs. Tolls have not been used in the Lower Mainland since the 1960s when they were removed from all bridges.

Drivers will have the option of opening a tolling account. This will include an electronic tolling device, or transponder, to be mounted on the vehicle's windshield. It will detect usage of the bridge, allowing toll charges to be automatically billed to the driver's account, streamlining the tolling process.
Vehicles without an electronic tolling device will have their license plates identified through an automated video recognition system, and will be billed accordingly. Drivers of such vehicles will also have the option to pay for their trip in advance by establishing a temporary account with a credit card, and will pay a lower toll rate than if they did not establish such an account.[6]

Type of Vehicle Toll-Device Pre-paid Without a toll device
Car $2.50 $3.00 $3.50
Truck or bus $5.00 $5.50 $6.00
Large truck $7.50 $8.00 $8.50
Motorcycle $1.25 $1.75 $2.25

  1. ^ Project Funding. Greater Vancouver Transit Authority (TransLink). Retrieved on August 6, 2006.


Crossings of the Fraser River
Upstream
Albion Ferry
Golden Ears Bridge
Downstream
Port Mann Bridge
Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.