Kenmore (MBTA station)

From Wikipedia, the free encyclopedia

Jump to: navigation, search
Kenmore Station
Entrance to Kenmore Station
Station statistics
Address 500 Commonwealth Avenue @ One Brookline Avenue, Boston
Lines MBTA Subway
Green Line ("B", "C" and "D" Branches)
Bicycle facilities eight spaces
Other information
Opened October 23, 1932
Owned by Massachusetts Bay Transportation Authority

Kenmore Station is a subway stop on Boston's MBTA, located in Kenmore Square. Besides serving Kenmore Square, it is the main stop for Fenway Park. There is a 'Fenway' stop located further down the 'D' branch of the Green Line, but it refers to the neighborhood of the same name and isn't as close to the ballpark. The Kenmore Station stop is also close to many Boston University dormitory residences including Myles Standish Hall and Shelton Hall. The stop is also central to the Boston University bookstore and the newly constructed Hotel Commonwealth.

The station serves as the branching off point for the B, C, and D trains on the Green Line. While all trains follow the same route going inbound (with the exception of the E train which doesn't join the others until Copley Square), going outbound they split at Kenmore branching off into different above-ground routes.

The station was closed for two months in 1996, after the Emerald Necklace overflowed it banks, completely submerging the platform and some of the mezzanine[1][2].

Until January 1, 2007, Kenmore was the last Green Line station heading outbound where passengers were required to pay a fare upon boarding, as boarding outbound trains at surface stops was free. Passengers now pay fares at surface stops regardless of whether they are going inbound or outbound. It was for this reason that fans going home from the game to the Newton Highlands region (serviced by the D) were advised to use the 'Fenway' stop.

The architect and urban designer for the project is DiMella Shaffer, Boston, MA.
The architect and urban designer for the project is DiMella Shaffer, Boston, MA.[3]

Kenmore station is currently undergoing major renovations, and while it is still operational, the station is occasionally closed for track construction. These renovations, which have suffered major delays, are expected to be completed in November 2007 or later[4]. The modernization of Kenmore Square Station is part of the MBTA's Light Rail Accessibility Program (LRAP).

To be completed:

  • New elevators, escalators
  • New bus shelter (see rendering)
  • Semi-raised platforms (for new Green-Line vehicles)
  • General surface improvements to Kenmore Square
  Preceding station     MBTA     Following station  
Green Line
Green Line
toward Riverside
Green Line

  1. ^ Julie Masis. "River's revival is more than a pipe dream", The Boston Globe. Retrieved on 2007-08-29. 
  2. ^ Scott Moore; George Chiasson, Jonathan Belcher. The Green Line Flood of 1996 (HTML). NETransit. Retrieved on 2007-08-29.
  3. ^ http://www.mbta.com/about_the_mbta/t_projects/?id=992
  4. ^ Mac Daniel. "Kenmore T work now in extra innings", The Boston Globe. Retrieved on 2007-04-17. 
Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.