Kingston Bridge, Glasgow

From Wikipedia, the free encyclopedia

Kingston Bridge, looking eastward up the River Clyde
Kingston Bridge, looking eastward up the River Clyde

The Kingston Bridge is a ten lane road bridge crossing the River Clyde in Glasgow, Scotland. The bridge carries the M8 motorway through the city centre. The Kingston Bridge is one of the busiest road bridges in Europe, carrying over 150,000 vehicles every day.

The bridge connects Anderston and the city centre at Junction 18/19 with Tradeston and the Gorbals at Junction 20. The bridge is notionally five lanes each way, however, approaches to the bridge are not only linked with many junctions of their own, including major city centre ramps and the M77, but are only two lanes wide.

When opened in 1969, the bridge was designed to handle only 20,000 vehicles a day. By 1990, the sheer volume and weight of traffic, combined with poor design, resulted in serious structural deterioration being discovered in the bridge. A decade-long repair and renovation programme was initiated to repair and strengthen the bridge. These repairs have involved raising the bridge, while still operational, to allow the construction of new supports, before lowering the bridge onto strengthened supports.

The ongoing works, combined with the design of the approach roads, causes traffic chaos at most times of day and is part of the reason the M8 has gained its reputation as one of the poorest designed motorways in the UK.

An attempt to solve the problem is the M74 northern extension, to act as the southern flank of the unbuilt Glasgow Inner Ring Road first planned in the 1960s. The existing "ski ramp" where the Inner Ring was intended to continue on will remain unused; the extended M74 is planned to meet the M8 a few hundred yards further south. This change of plan from the Scottish Executive is because of the Kingston Bridge's inability to handle an increase in traffic: the thinking is that the increased traffic from the new road will not then go straight over the bridge. At the Public Inquiry into the road scheme, critics countered that this would mean an increase in ground-level traffic in the Tradeston area as commuters attempt to gain access to the bridge's access ramps.

With the M74 extension project not due for completion until 2009, a shorter term solution to the congestion problems has been the Clyde Arc or "Squinty Bridge", which opened in September 2006 - this route is expected to take at least some of the local short-distance traffic away from the Kingston.

Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.