Kuala Lumpur International Airport ERL station

From Wikipedia, the free encyclopedia

(Redirected from KLIA ERL station)
Jump to: navigation, search
KLIA
A platform at the KLIA ERL station.
Station statistics
Address The Kuala Lumpur International Airport, Sepang, Selangor, Malaysia.
Lines KLIA Transit and KLIA Ekspres (Express Rail Link) (2002 to present)
Platforms 1 island platform (KLIA Ekspres)
1 island platform (KLIA Transit)
Tracks 2 (KLIA Ekspres)
2 (KLIA Transit)
Other information
Opened 2002
Owned by ERL Private Limited

Kuala Lumpur International Airport ERL station or KLIA ERL station is served by Express Rail Link (ERL) Sdn. Bhd. in Kuala Lumpur International Airport (KLIA), Malaysia. The ERL station comprises two separate stations under the Main Terminal Building, KLIA.

Contents

This station is exclusive to KLIA Ekspres which provides a non-stop express train service to the KL City Air Terminal (KL CAT), part of the Kuala Lumpur Sentral transportation hub in Kuala Lumpur.

The non-stop trip between Kuala Lumpur and KLIA is 57 kilometres and takes exactly 28 minutes. Trains depart at 15-minute intervals during peak hours and 20-minute intervals during off-peak hours. A basic one-way trip costs 35 ringgit (RM35).

KLIA Ekspres station is on the first floor of the Main Terminal Building.

Another station is for KLIA Transit, a high-speed commuter train service linking Kuala Lumpur Sentral and the Kuala Lumpur International Airport (KLIA). It shares the same tracks as the KLIA Ekspres but unlike the direct airport express service, KLIA Transit stops at three other stations, namely Bandar Tasik Selatan, Salak Tinggi, and Cyberjaya/Putrajaya. Check-in facilities are not available at KLIA Transit stations.

KLIA Transit station can only be accessed from the third floor (arrivals) of the Main Terminal Building, despite being on the first floor.

  • Feeder buses currently ferry passengers between the Main Terminal Building and the Low Cost Carrier Terminal. In November 2006, the Malaysian government announced that it has approved in principle the construction of a rail link between the Main Terminal Building and the Low Cost Carrier Terminal. Construction is scheduled to begin only after a new LCCT built.

Preceding station Rail Lines (Klang Valley) Following station
Kuala Lumpur Sentral   KLIA Ekspres   Terminus
Salak Tinggi   KLIA Transit   Terminus
Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.