Launch Control Center

From Wikipedia, the free encyclopedia

KSC LC39 Launch Control Center and VAB.
KSC LC39 Launch Control Center and VAB.

The Launch Control Center (LCC) is a four-story building located at Kennedy Space Center, and is used for the supervision of launches from Launch Complex 39. In practice, this means that the LCC handles all manned spaceflights from KSC. Attached to the southeast corner of the Vehicle Assembly Building, the LCC contains offices; telemetry, tracking and instrumentation equipment; the automated Launch Processing System; and four firing rooms.

Contents

Firing Room 1 at Kennedy Space Center.
Firing Room 1 at Kennedy Space Center.
Firing Room 2 at Kennedy Space Center.
Firing Room 2 at Kennedy Space Center.

The firing room is the headquarters from which launch operations are supervised and controlled. Responsibility for the booster and spacecraft remains with the LCC until it clears the launch tower; at this point, responsibility is handed over to the Mission Control Center at Johnson Space Center.

Flights have been controlled from the firing rooms at the LCC since the Apollo program. Extensive renovation of Firing Room 4 finished in 2006.

The Launch Director is the head of the launch team, and is responsible for making the final "go/no go" decision for launch after polling the relevant team members.

The Flow Director is responsible for the preparation of the spacecraft for launch, and remains in the LCC in an advisory capacity.

The NASA Test Director is responsible for all pre-launch testing, whether involving the flight crew, the orbiter, the external tank/solid rocket booster, or ground support equipment. The NTD is also responsible for the safety of all personnel on the pad after fuelling has occurred. Reports to the Launch Director.

The Orbiter Test Conductor is in charge of all pre-flight checkout and testing of the orbiter, and manages the engineers in the firing room who monitor the orbiter's systems. OTC is an employee of a contractor rather than of NASA.

The Ground Launch Sequencer Engineer is responsible for monitoring the operation of the automated Ground Launch Sequencer system, which controls the countdown from T-9 minutes until launch. After this point, they are in charge of implementing a manual hold if necessary. The request for a hold is phrased "CGLS, give cutoff."

Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.