Chapelcross nuclear power station

From Wikipedia, the free encyclopedia

Chapelcross nuclear power station.
Chapelcross nuclear power station.

Chapelcross, previously the Chapelcross Processing Plant (CXPP), codenamed CANDLE, was a Magnox nuclear power plant located near the town of Annan in Dumfries and Galloway in south west Scotland. It was the sister plant to Calder Hall in Cumbria, England, both built and originally operated by the UKAEA (United Kingdom Atomic Energy Authority) Production Group.

The primary purpose of both plants was to produce weapons-grade plutonium for the UK's nuclear weapons programme (see WE.177), but they also generated electrical power on a commercial basis with a thermal efficiency of 19%.

Chapelcross operated from 1959 until 2004. At the time of its closure it was one of the oldest nuclear power plants in the United Kingdom. It consisted of 4 x 50MWe Magnox reactors generating a peak electric power output of 200MWe.

Contents

Chapelcross nuclear power station.
Chapelcross nuclear power station.

A tritium production facility called the Chapelcross Processing Plant (CXPP) operated on the site from 1980 until 2005, managed by BNFL for the UK Ministry of Defence. Liquid effluent was disposed of via a pipeline to the Solway Firth, and radioactive gases discharged to the atmosphere. All environmental discharges are subject to an annual discharge authorisation which is regulated by SEPA, the Scottish Environment Protection Agency. Because of involvement in the defence programme, the site was not subject to international safeguards until 1998[1].

Several thousand tonnes of MDU (Magnox Depleted Uranium) generated by historical reprocessing are stored in drums in a large building at Chapelcross. These are being over-packed with stainless steel drums and dispatched by road to Capenhurst for long-term storage as part of the wider programme of remediation and decommissioning funded by the Nuclear Decommissioning Authority (NDA) on UK nuclear sites. (See external links).

In May 1967, reactor 2 suffered a partial nuclear meltdown, when one fuel channel that was loaded with fuel elements under evaluation for the commercial reactor programme experienced a partial blockage, attributed to the presence of graphite debris (see fuel element failure). The fuel overheated and the Magnox cladding failed, causing contamination to be deposited in one region of the core. The reactor was restarted in 1969 after successful clean-out operations and was the final reactor to cease operation. [2] [3].

Chapelcross nuclear power station.
Chapelcross nuclear power station.

In 2001, during a refuelling campaign on reactor 3, a basket of discharged fuel elements (see nuclear fuel cycle) was dropped. An investigation was carried out by the Nuclear Installations Inspectorate (NII) and a report is available describing the incident (see External links).

Defuelling is due to begin at Chapelcross in March 2007. The nuclear fuel will be removed and taken to Sellafield in Cumbria for reprocessing.

The strategy for decommissioning the Magnox nuclear power stations is known as deferred site clearance. It plans for total site clearance around 100 years after the initial shutdown[4]

Coordinates: 55.01566° N 3.22605° W

Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.