Pakistan Railways

From Wikipedia, the free encyclopedia

Jump to: navigation, search
This article is about the rail company in Pakistan. For technical details and operations see: 'Transport in Pakistan'.
Pakistan Railways
logo
Reporting marks PR
Locale Pakistan
Dates of operation 1947–present
Track gauge ft 8½ in (1435 mm) (standard gauge)
Headquarters Lahore, Punjab

Pakistan Railways is the state-owned railway company of Pakistan. It is a large organization under the administration of the Pakistani Government's Ministry of Railways. Pakistan Railways provides an important mode of transportation in the farthest corners of the country and brings them closer for business, sightseeing, pilgrimage and education. It has been a great integrating force and forms the life line of the country by catering to its needs for large scale movement of people and freight. The current chairman is Mr. Shakil Durrani.

Contents

The possibility of Karachi as a sea port was first noticed in the middle of 19th century. Sir Henry Edward Frere was appointed Commissioner of Sindh after its annexation with Bombay in 1847 and sought permission from Lord Dalhousie to begin a survey for a sea port. He also initiated the survey for a railway line in 1858. It was proposed that a railway line from Karachi City to Kotri, steam navigation up the Indus and Chenab rivers up to Multan and from there another railway to Lahore and beyond be constructed.

It was on 13 May 1861, that the first railway line was opened for public traffic between Karachi City and Kotri, a distance of 105 miles (169 km). The line between Karachi City and Kiamari was opened on 16 June 1889. During 1897 the line from Keamari to Kotri was doubled.

The railway line from Peshawar to Karachi closely follows Alexander’s line of march through the Hindu Kush mountains to the Arabian Sea. Different sections on the existing main line from Peshawar to Lahore and Multan and branch lines were constructed in the last quarter of 19th century and early years of 20th century.

The four sections, i.e., Scinde (Sindh) Railways, Indian Flotilla Company, Punjab Railway and Delhi Railways, working in a single company, were later on amalgamated into the Scinde, Punjab & Delhi Railways Company and purchased by the Secretary of State for British South Asia in 1885, and in January 1886, it was named North Western State Railways, which was later on renamed as North Western Railways.

At the time of independence, 1,947 route miles (3,133 km) of North Western Railways were transferred to India, leaving 5,048 route miles (8,122 km) to Pakistan. In 1954, the railway line was extended to Mardan and Charsada, and in 1956 the Jacobabad-Kashmore 2 ft 6 in (762 mm) gauge line was converted into broad gauge. The Kot Adu-Kashmore line was constructed between 1969 and 1973 providing an alternative route from Karachi up the country.

In 2007, contracts were let for studies into a link between Pakistan and China via the border crossing near Kashgar.[1]

A line to the deepwater port of Gwadar is also proposed.

The total length of railway tracks in Pakistan is 5,072 miles (8,162 km). The busiest routes include:

The major stations and junctions between Peshawar and Karachi include:

Peshawar,Darya Khan,Mianwali,Bhakkar,Kaloorkot Nowshehra Jn., Attock city, Rawalpindi, Jhelum, Lalamusa Jn., Gujrat, Wazirabad Jn., Gujranwala, Lahore, Lahore Cantt., Raiwind Jn., Okara, Sahiwal, Chichawatni, Mianchannu, Khanewal Jn., Multan cantt., Lodhran Jn., Bahawalpur, Samasatta Jn., Khanpur, Rahim Yar Khan, Sadiqabad, Pannu Aqil Cantt., Rohri Jn., Khairpur, Bhiria Road, Nawabshah, Tandu Adam, Hyderabad Jn., Kotri Jn.,Jangshahi, Landhi Jn., Karachi cantt. and Karachi City.

The major stations and junctions between Peshawar and Quetta are:

Peshawar to Rohri Jn. (same as above), Sukkur, Shikarpur, Jacobabad Jn., Dera Murad Jamali, Sibi Jn., Ab-e-Gum, Mach Spezand Jn and Quetta

Passenger traffic comprises 50% of the railway's total revenue. During 1999-2000, this amounted to Rs. 4.8 billion. Pakistan Railways carries 65 million passengers annually and daily operates 228 mail, express and passenger trains. The number of passengers carried daily is thus about 178,000. Pakistan Railways also operates special trains during occasions like congregations of the Dawat-e-Islami and the Tableeghi Ijtima.[citation needed]

The Freight Business Unit, with 12,000 personnel, operates over 200 freight stations on the railway network. The Unit serves two major ports of Karachi and Bin Qasim as well as all four provinces of the country and generates revenue from the movement of agricultural, industrial and imported products, Petroleum Oil & Lubricants (POL), wheat, coal, fertilizer, rock phosphate, cement, container traffic and sugar. About 39% of the revenue is generated from the transportation of POL products, 19% from imported wheat, fertilizer and rock phosphate. The remaining 42% is earned from domestic traffic.[citation needed]

The Freight Business Unit offers services to meet customer requirements and reduce costs through efficiency, innovation and modernization. All possible efforts are made to increase revenues and pass on the benefits to customers. The Freight Business Unit is headed by an additional General Manager.[citation needed]

The Freight Rates structure is based on market trends, particularly of road transport, which is the Railways' main competitor. The freight rates are no longer rigid but flexible, depending on the lead, peak-off peak season, and quantum offered.[citation needed]

Pakistan Railways Headquarters in Lahore, Pakistan
Pakistan Railways Headquarters in Lahore, Pakistan

The Pakistan Locomotive Factory at Risalpur, a public spread on an area of 251 acres, was put into service in 1993 with the collaboration of Government of Japan at a total cost of Rs.2284.00 million, including a foreign exchange component of Rs.1496.00 million. The factory can produce two diesel-electric locomotives per month on single-shift basis, but this can be doubled by introducing a second working shift. The factory is equipped with the state-of-the-art equipment which can be employed in the building of diesel-electric locomotives of suitable horsepower, as well as electric locomotives with minor adjustments.[2]

Since 1993, twenty three PHA-20 type 2,000 hp diesel-electric locomotives have rolled out of the factory.[2] The ongoing project of 3,000 hp AGE-30 diesel-electric locomotives is at the verge of its completion, which is a milestone in the history of the factory.[2] Apart from manufacturing new locomotives, the Pakistan Locomotive Factory has also successfully rehabilitated five diesel-electric locomotives of GRU-20 Type and manufactured other various spares/components for railway maintenance divisions and rehabilitation projects.

Pakistan railway still suffers from a mixture of gauges, 1,676 mm (5 ft 6 in) and 1,000 mm (3 ft 3⅜ in), but this is being gradually tackled by converting the narrow gauge lines to broad gauge, with little narrow gauge remaining.

QUETTA: Railways Minister Sheikh Rashid has said construction work on the 295 km Bostan-Zhob railway section will be started soon and the narrow gauge railway track will be converted into the broad gauge.

[1]

Should Pakistan Railways link up with railways to the west and north, breaks of gauge will be created so:

  • Ghotki train crash
    • In its worst accident in recent years, three passenger trains collided on 13 July 2005, derailing 13 carriages and leaving at least 120 dead. The Karachi Express ran into the back of the Quetta Express while it was stopped at a station near Ghotki, and the Tezgam Express travelling in the opposite direction hit several of the derailed carriages. According to officials, the conductor of the Karachi Express misread a signal.[3]
  • Super Parcel Express
    • On 21 August 2005, the upcountry Super Parcels Express derailed while crossing the Malir Bridge near Landhi in the Karachi Division. Eight bogies were substantially damaged when an axle broke due to over loading. The rail traffic was suspended for 24 hours. All down trains were terminated at Landhi and the rakes and the locos made the turn around from Landhi.

In 2006, Ministry of Railways announced that railway tracks between Gwadar and Quetta will be built. The Bostan-Zhob narrow-gauge railway line will be converted into broad gauge within one year. These two projects will be developed at a cost of US$1.25 billion.

In addition, there are several ongoing schemes of expansion into West Asia and electrification (worth about $2 billion) over the five year period from 2005-2010.[4]

Also, a high-speed railway (about 300km/h) between Punjab and Sindh is planned at a cost of $1 billion.[5]

In late 2006, plans to increase train speeds, install more lengths of double track and to convert the country's railways to standard gauge and establish direct rail connections with China have been announced by the president of Pakistan.[6]

The 274 km (170 mile) section between Lahore and Khanewal is currently electrified.

  1. ^ Fazl-e-Haider, Syed. "China-Pakistan rail link on horizon", Asia Times, 2007-02-24. Retrieved on 2007-08-12. 
  2. ^ a b c Pakistan Railway. pakrail.com. Retrieved on 2007-08-11.
  3. ^ "World's worst rail disasters", BBC, 2005-07-13. Retrieved on 2007-08-12. 
  4. ^ Pakistan Railway. Achievements & Plans. Retrieved on 2007-08-12.
  5. ^ http://www.msnbc.msn.com/id/14618614/[dead link]
  6. ^ "Railway track be laid between Pakistan and China: Musharraf", PakTribune, 2006-12-19. Retrieved on 2006-12-19. 

Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.