Park Row (BMT station)

From Wikipedia, the free encyclopedia

Jump to: navigation, search
Park Row station, circa 1905
Park Row station, circa 1905

Park Row was a major elevated railway terminal constructed over the New York end of the Brooklyn Bridge, across from New York City Hall in Manhattan that served as the terminal for BMT services operating over the Brooklyn Bridge from the BMT Fulton Street Line, BMT Myrtle Avenue Line and their feeders. Until the opening of the nearby Williamsburg Bridge to elevated train traffic in 1913, it was the only Manhattan station available for elevated trains from Brooklyn.

Contents

For the first decade-and-a-half of its existence, it was used exclusively by trains of the New York and Brooklyn Bridge Railway, a cable-hauled line that spanned the length of the bridge between Park Row and another terminal at the Brooklyn end of the bridge.

On June 18, 1898, elevated trains of predecessor companies of the BMT began using the station.

At its height, Park Row terminal had four platforms on four tracks in the main part of the terminal, and another three platforms on two tracks beyond (west of) the main train shed. This resulted in very complex scheduling and track shifting, so that most trains discharged their passengers at dedicated exit platforms and then were transferred to tracks on other platforms for loading of outgoing passengers. From the turn of the 20th century until 1913, the following lines were hosted at least part-time at Park Row:

Circa 1911 view of City Hall Park, with the terminal at right
Circa 1911 view of City Hall Park, with the terminal at right

As new bridges and new subways took the pressure off of the Brooklyn Bridge services, ridership at Park Row gradually declined.

  • October 27, 1913: Last day of Sea Beach elevated service, in preparation for the new grade-separated line that began to use the Fourth Avenue subway on June 22, 1915
  • June 23, 1916: West End trains began using the Fourth Avenue subway exclusively
  • August 1, 1920: Brighton Beach trains began using a new connection to the BMT Broadway Line subway, severing its connection with the Fulton Street Line
  • May 30, 1931: Some Culver trains were rerouted to the Fourth Avenue subway and the BMT Nassau Street Line when the latter line opened
  • 1936: Park Row was reconfigured to two tracks total (the two southern main shed tracks) in recognition of its declining use and to simplify operations
  • May 31, 1940: In preparation for New York City takeover of the BMT system, the Fifth Avenue and Bay Ridge lines and services were abandoned, which also ended remaining Culver elevated service via those lines. The main line of the Fulton Street line was abandoned at the same time and, on June 1, a new service, Fulton-Lex, was introduced, bringing trains from the surviving outer portion of the Fulton Street Line to Park Row over the Lexington and Myrtle Avenue Lines.

  • March 5, 1944, all remaining elevated lines stopped using Park Row, and the Myrtle Avenue, Lexington Avenue, and Fulton-Lex services were cut back to the Bridge Street station in downtown Brooklyn.

Brooklyn Bridge streetcars were shifted to the elevated tracks and used them until 1950, when all transit was removed from the bridge. The streetcars did not use the Park Row terminal, but continued to use the trolley loops beneath the train shed, which was torn down.

Coordinates: 40°42′44″N, 74°0′16″W

Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.