Sequoyah Nuclear Generating Station

From Wikipedia, the free encyclopedia

(Redirected from Sequoyah 1)
Jump to: navigation, search
NRC Region Two
(South)
Alabama
 Bellefonte (unfinished)
 Browns Ferry
 Farley
Florida
 Crystal River 3
 St. Lucie
 Turkey Point
Georgia
 Hatch
 Vogtle
North Carolina
 Brunswick
 McGuire
 Shearon Harris
South Carolina
 Catawba
 Oconee
 H.B. Robinson
 Summer
Tennessee
 Sequoyah
 Watts Bar
Virginia
 North Anna
 Surry


The Sequoyah nuclear power plant is located on 525 acres (2.1 km²)located 7 miles east of Soddy-Daisy, Tennessee, and 20 miles north of Chattanooga, abutting Chickamauga Lake, on the Tennessee River. The facility is owned and operated by the Tennessee Valley Authority.

The plant has two Westinghouse pressurized water reactors. The first reactor began operation in September 1980, followed by the second a year later.

Within months of starting operations, some 420,000 liters of radioactive coolant leaked due to operator error and several workers were exposed to radiation, but the spill was kept inside the containment building[citation needed].

Sequoyah's two units have a winter net dependable capacity of 2,333 megawatts[1], making Sequoyah the most productive of TVA's 4 nuclear plants. Sequoyah is the second-most powerful electric plant in the entire TVA system, second only to the Cumberland coal-fired plant northwest of Nashville.[citation needed]

The operating license of Sequoyah's Unit 1 expires in 2020. Unit 2's operating license expires in 2021.[1]

TVA constructed dry cask storage facilities at Sequoyah and purchased special storage containers for the purpose of storing spent nuclear fuel. The storage facilities have been approved by the NRC.[1]

TVA's Sequoyah operating license was modified in Sept. 2002 to allow TVA to irradiate tritium-producing burnable absorber rods at Sequoyah for the U.S. Department of Energy. The process of irradiating tritium-producing rods produces tritium, which is used in nuclear weapons. TVA began irradiating tritium-producing rods at its Watts Bar Nuclear Generating Station in 2003. As of February 2007, TVA had no plans to produce tritium at Sequoyah.[1]

  1. ^ a b c d Securities & Exchange Commission filing. Available at http://www.sec.gov/

Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.