Sierra Leone Government Railway

From Wikipedia, the free encyclopedia

The Sierra Leone Government Railway operated in the West African country of Sierra Leone from 1897 to 1974. It was unusual in that it formed a national railway system constructed solely to a 2 ft 6 in (762 mm) rail gauge. Such a narrow gauge was usually confined to feeder railways.

Contents

There were a number of early proposals for a railway in the British colony of Sierra Leone dating from 1872, and including a proposal for a trans-Sahara railway, all of which came to naught. Finally in 1893 a proposal financed by the Liverpool Chamber of Commerce was adopted, and surveying commenced. Survey parties confronted many difficulties, especially disease. Construction commenced from Freetown in 1896, and the first section of railway was opened to Wellington (7 miles) by March 1897. Subsequent openings were:

  • Waterloo, April 1898
  • Songo (32 miles) 1899
  • Rotifunk (56 miles) 1900
  • Bo (103 miles) 1903
  • Baiima (220 miles) 1905
  • Pendembu (227.5 miles) 1907

Other lines were also constructed. A short branch of 5.5 miles length was built in 1903 from Freetown to Hill Station, at 748 feet above sea level. The line allowed Europeans to live in the healhier hills area above Freetown, but was closed in 1929.

A more substantial branch was built from Bauya Junction to Makeni (84 miles) in 1914. It was later extended to Kambai (104 miles), but subsequently cut back to Makeni in 1930. At this tme total route length was 311 miles.

The railways assumed increased importance in World War II. Apart from moving mineral resources from the interior to the coast, the railway was also important in supporting fighting in North Africa. Fighter aircraft were shipped to the end of the line, where they were assembled and flown on to Egypt.

The equipment of the railway was renewed in the 1950s, with the introduction of diesel locomotives, and the purchace of some 155 new freight wagons. Both freight and passenger traffic was increasing during this decade. Independence came to Sierra Leone in 1961, and as an independence gift the United Kingdom gave 45 new passenger coaches.

Increased road traffic and changes in government policy in the 1960s saw a decline in traffic, and various proposals for its future. They included a new branch to serve a bauxite mine, and converting to a wider gauge. However the report of the United Nations Special Fund, which recommended closure, was adopted. The Makeni branch was closed in 1968, followed by the Kenema - Pendembu section in 1971. Further closures as far as Bo occurred in 1973, and final closure in 1974.

First locomotives supplied to the railway were two 0-6-0T built by the Hunslet Engine Company and supplied in 1897. These were quickly followed by a 2-6-2T design from Hunslet, a design that proved very successful and enduring, a large number were built between 1898 and 1920. Further locos of this design continued to be supplied throughout the steam era, the last two being built in 1954. This design was the pattern for the Welsh Highland Railway locomotive "Russell".

Five 2-8-2T from Hunslet were supplied in 1906, to be followed by two 4-8-0 tender locos from Naysmyth Wilson in 1910. Further 4-8-0 locos were built by North British and Hawthorn Leslie, bringing the total to 17 by 1921. 1926 saw the introduction of 2-6-2+2-6-2 Garratts from Beyer-Peacock, eliminating double heading of a 2-6-2T with a 4-8-0. The 2-8-2T had proved unsuitable, and all were withdrawn by the mid 1920s.

World War 2 saw great demands placed on the railway, and its importance was demonstrated by the railway being supplied with a number of new locomotives. Six new Garratts were supplied in 1942, and twenty 4-8-0's were built by W.G. Bagnall and Barclay. Additionally, six 2-8-0 locomotives that had been built in Switzerland were brought in from the South India Railways. In an effort to further increase capacity, five of the earlier 2-6-2+2-6-2 Garratts were converted to a 2-8-0+0-8-2 wheel arrangement so as to increase tractive effort. Experience with these modified Garratts influenced the final steam class purchaced by the railway. In 1956 fourteen modern 4-8-2+2-8-4 Garratts were purchaced from Beyer-Peacock. These locos increased the maximum load over 1:50 grades from 200 tons to 270 tons.

In the meantime the railway had turned to diesel traction. The first were purchased in 1954, being three 145HP, 20 ton 0-8-0's built by Hudswell Clarke primarily for shunting duties, followed by five more in 1960. A class of larger diesels was supplied by the same maker between 1958 and 1961. The class consisted of twenty-four 225HP 29 ton 2-8-2's for mainline use. These locos were a limited success, speeding up operations and reducing costs, however were not without their problems. Batteries supplied on the locos were not large enough to start the motors, and a van with additional batteries had to accompany them as a tender. Overall the railway had difficulties in maintaining the diesel locos, and steam locos continued to operate. At closure the railway possessed five operating steam locos, and four diesels.

The railway was built with 30lb rail, limiting axle loads to 5 tons. Some of the extensions were built as "tramways", with rail weight reduced to 20 and even 15lb. In an effort to increase axle loadings and the speed limit above 20mph, some sections of the line were rebuilt with 40lb rail in the 1950s.

Most of the line was built with a 1 to 50 gradient, but some sections were as steep as 1 to 39. The Hill Station line had a gradient of 1 to 22. There were 139 bridges with a span of over 20 feet on the line, the longest being of six spans and 716 feet across.

At closure in 1974 one of the 2-6-2T Hunslets, together with some coaches, were purchased and shipped to the Welshpool and Llanfair Light Railway in Wales, where they continue to operate in tourist service. The loco happened to be the last of the Hunslets built for the railway.

In Sierra Leone a collection of rolling stock was retained at the former railway workshops to form a museum. Locos included one of the 4-8-2+2-8-4 Garretts, a Hunslet tank, and a couple of the diesel locos. Several coaches were also kept, including the Governor's coach, and a coach specially prepared for the visit of Queen Elizabeth II in 1961. Through the years of civil strife and war this collection disappeared from sight and it was feared it had been destroyed. However the collection survived despite the workshops being used as a centre for displaced persons. Following the initiative of a British army officer, Colonel Steve Davies, restoration of the equipment has commenced in 2004. The President of the Republic of Sierra Leone, Alhaji Dr. Ahmad Tejan Kabbah, has visited the workshops site and indicated his support for restoring the museum and preserving the railway heritage of Sierra Leone.

  • Durrant, A.E., A.A. Jorgensen, & C.P. Lewis 1981 Steam in Africa Hamlyn. ISBN 0-600-34946-2
  • Rowe, D.Trever The Sierra Leone Government Railway in Locomotives International No. 41 Dec 1997-Jan 1998.
  • Thorne, G. 1996 Scrapbook of Narrow Gauge Drawings , 7mm Narrow Gauge Association.
Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.