St. Louis Metrolink

From Wikipedia, the free encyclopedia

St. Louis MetroLink
Locale St. Louis metropolitan area
Transit type Light rail
Began operation July 1993
System length 46 mi (74 km)
No. of lines 2
No. of stations 37
Daily ridership 49,287 (FY 2006)
Track gauge 1,435 mm (4 ft 8½ in) (standard gauge)
Operator Bi-State Development Agency dba Metro

MetroLink is a light rail transit system in the Greater St. Louis area of Missouri and Illinois. The system currently consists of two lines connecting Lambert-Saint Louis International Airport and Shrewsbury, MO with Scott Air Force Base near Shiloh, IL through downtown St. Louis. The system features 37 stations and carries an average of 49,287 people each weekday (FY 2006).[1]

A second line, the "Cross-County Extension," opened to the public August 26, 2006. This 8-mile-long, 9-station line connects Washington University, Clayton, the popular Saint Louis Galleria shopping center and Shrewsbury to the system.[2]

Further extensions are under study, but no alignments have yet been chosen, engineered or funded. A 5.3 mile eastward extension of the existing line to MidAmerica St. Louis Airport, a civilian airport sharing runways with Scott AFB, has been proposed; however, there are no current plans to fund or build it.

MetroLink is operated by the Bi-State Development Agency, which since 2003 is doing business as Metro.

Contents

A MetroLink Train at the Central West End Station
A MetroLink Train at the Central West End Station
Civic Center Station
Civic Center Station

Construction on the initial MetroLink alignment from Lambert-St. Louis International Airport to the 5th & Missouri station in East St. Louis began in 1990. The portion between North Hanley and 5th & Missouri stations opened in July 1993, and the line was extended westward to Lambert Airport Main station in 1994. At that time another station, East Riverfront, was opened in East St. Louis. Four years later, in 1998, the Lambert Airport East station was added. The capital cost to build the initial phase of MetroLink was $465 million. Of that amount, $348 million was supplied by the Federal Transit Administration (FTA).[1]

MetroLink exceeded pre-opening ridership estimates, but the system has expanded slowly. Construction on proposed extensions has been delayed by the increasing scarcity of FTA funds. As time has passed, an ever-greater share of the costs has been borne by state and local governments. The most recent work has been entirely funded by local dollars.

Construction on the St. Clair County MetroLink extension from the 5th & Missouri station to the College station in Belleville began in 1998 and opened in May 2001. The extension added eight new stations and seven park-ride lots. The total project cost was $339.2 million, with the FTA and St. Clair County Transit District sharing the burden at 72% ($243.9 million) and 28% ($95.2 million), respectively. Local funding was provided by the St. Clair County Transit District as a result of a 1/2 cent sales tax passed in November 1993.[1]

In May 2003, a 3.5-mile extension from Southwestern Illinois College to Shiloh-Scott station opened. This $75 million project was funded by a $60 million grant from the Illinois FIRST (Fund for Infrastructure, Roads, Schools, and Transit) Program and $15 million from the St. Clair County Transit District.[1]

The recent Cross-County Extension project was funded by a $430 million Metro bond issue. Metro cited repeated delays and cost overruns as its reasons for firing its general contractor in Summer 2004. The contractor, itself a coalition of four general contractors, in turn cited excessive change orders by Metro as the cause of the problems. After firing the general contractor, Metro functioned as its own general contractor on the project. The rail portion of the extension opened to the public August 26, 2006, although some ancillary work—most notably, the construction of a parking garage at the Brentwood I-64 station—will not be complete until spring of 2007.

MetroLink operates a fleet of 87 light-rail vehicles composed of 31 SD-400 and 56 SD-460 vehicles. Each 90 foot long, single articulated vehicle has 4 high platform doors per side and has a capacity of 72 seated and 106 standing passengers. [3][4]

There are two train yards in the transit system for the storage and maintenance of light-rail vehicles: the primary yard is located between the Grand and Union Station stops just west of downtown St. Louis; the other yard is located between the JJK and Washington Park stops in Illinois.

MetroLink uses a proof-of-payment system. Tickets can be purchased at ticket vending machines at the entrance to all stations and must be validated before boarding the train.

  • 1 Ride Ticket - $2.00 (reduced fare - $1.00)
  • 2 Hour Pass - $2.25 (reduced fare - $1.10)
  • 2 Hour Pass from Lambert Airport - $3.50 (reduced fare - $1.75)
  • One-Day Pass - $4.50

Reduced fares can be purchased by seniors ages 65+, people with disabilities, and children ages 5-12. Childer younger than 5 years of age ride free. Proof of age may be requested of all people riding with reduced fares. Weekly and monthly passes are also available in addition to the fares listed above.[5]

Map of St. Louis' MetroLink light rail system
Map of St. Louis' MetroLink light rail system

Lambert Airport Main to Shiloh-Scott

Shrewsbury-Lansdowne I-44 to Emerson Park

MetroLink in Belleville IL
MetroLink in Belleville IL
  • St. Clair County Extension Phase III: Shiloh-Scott to Mid-America Airport
  • Metro South: Shrewsbury to Butler Hill
  • Daniel Boone: Clayton to Westport
  • Northside: Downtown to Goodfellow & I-70 to St. Louis Community College-Florissant Valley
  • Southside: Downtown to Bayless to Butler Hill

Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.